ODLAW SWITCH substation interconnection queue

2 active projects totalling 261.3 MW in the ERCOT queue.

2active projects
261.3active MW
2total filed
Queue IDProjectkVMWResourceStatus
26INR0448 Cairos Storage 2 138 184 Battery SS Completed, FIS Started, No IA
26INR0245 Cairos Storage 138 77.3 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.