Nelson Sharpe substation interconnection queue

2 active projects totalling 220 MW in the ERCOT queue.

2active projects
220active MW
2total filed
Queue IDProjectkVMWResourceStatus
23INR0061 Noria Solar DCC 345 145 Solar SS Completed, FIS Started, IA
23INR0062 Noria Storage 345 75 Battery SS Completed, FIS Started, IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.