Gray Substation substation interconnection queue

2 active projects totaling 1,418.1 MW in the ERCOT queue.

2 ERCOT queue filings name Gray Substation as the point of interconnection, all in Gray County, TX.

Target commercial operation dates as filed run from May 2028 to Jun 2028 (2 filings). 2 active filings target a date after November 27, 2026.

Interconnecting entity as filed: IP Meitner, LLC (2 filings).

2active projects
1,418.1active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
29INR0103 Meitner 2 Wind 345 709.1 Wind SS Completed, FIS Started, No IA Jun 2028
26INR0113 Meitner Wind 345 709 Wind SS Completed, FIS Started, IA May 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “Gray Substation” in TX. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.

Other ERCOT queue substations in Gray County, TX

No other substation in Gray County, TX is named as a point of interconnection in the ERCOT queue.

All 3 ERCOT queue filings in Gray County, TX.