Cottonwood substation interconnection queue

2 active projects totalling 402.3 MW in the ERCOT queue.

2active projects
402.3active MW
2total filed
Queue IDProjectkVMWResourceStatus
23INR0089 Donegal Solar 345 201.6 Solar SS Completed, FIS Started, IA
25INR0165 Timberlakes Solar 345 200.7 Solar SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.