Comanche substation interconnection queue

2 active projects totalling 819.3 MW in the ERCOT queue.

2active projects
819.3active MW
2total filed
Queue IDProjectkVMWResourceStatus
22INR0237 Dragan Solar 345 411 Solar SS Completed, FIS Started, No IA
22INR0400 Dragan Storage 345 408.3 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.