Substation Scout

Bernoulli (bus # ) substation interconnection queue

2 active projects totalling 600 MW in the ERCOT queue.

2active projects
600active MW
2total filed
Queue IDProjectkVMWResourceStatus
25INR0608 Proteus London-Leigh Solar SLF 345 600 Solar SS Completed, FIS Started, No IA
25INR0609 Proteus London-Leigh Storage SLF n/r 0 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.