Adamsville substation interconnection queue

2 active projects totalling 310.5 MW in the ERCOT queue.

2active projects
310.5active MW
2total filed
Queue IDProjectkVMWResourceStatus
30INR0037 Solgen Solar 138 160.2 Solar SS Completed, FIS Started, No IA
30INR0038 Solgen Storage 138 150.3 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.