Thunder Bird 1 Gas
ERCOT queue ID 30INR0110
Thunder Bird 1 Gas (30INR0110) is listed in the ERCOT interconnection queue as a 1,272.8 MW gas project in Jack County, TX. The filing names Tap Double circuit line between Jacksbro_5 to Willowck_5 and Jacksbro_5 to Hendrch_5 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 14, 2030. It records the screening study as complete on October 3, 2026.
| Queue ID | 30INR0110 |
|---|---|
| Project name | Thunder Bird 1 Gas |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap Double circuit line between Jacksbro_5 to Willowck_5 and Jacksbro_5 to Hendrch_5 |
| Point of interconnection | Tap Double circuit line between Jacksbro_5 (1429) to Willowck_5 (1421) and Jacksbro_5 (1429) to Hendrch_5 (1443) |
| County | Jack |
| State | TX |
| Voltage | Not reported |
| Capacity | 1,272.8 MW |
| Resource (as published) | GAS/CC |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2030-09-14 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Jack, TX: 18 requests in the ERCOT queue, 17 active totaling 7,978.1 MW.
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-11-09 | Status change | n/a | SS Started, FIS Started, No IA → SS Completed, FIS Started, No IA |
Additional filed fields
| Interconnecting entity | BKV Power Ventures Jack, LLC |
|---|---|
| CDR reporting zone | NORTH |
| Fuel code | GAS |
| Technology code | CC |
| Screening study complete | 2026-10-03 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.