Ironwood Energy Center II

ERCOT queue ID 30INR0107

Ironwood Energy Center II (30INR0107) is listed in the ERCOT interconnection queue as a 742.5 MW gas project in Callahan County, TX. The filing names Reata Station as its point of interconnection. ERCOT lists its status as “SS Started, FIS Started, No IA”, with a target commercial operation date of July 1, 2031.

Queue ID30INR0107
Project nameIronwood Energy Center II
Status (as published)SS Started, FIS Started, No IA
SubstationReata Station
Point of interconnection68051 Reata Station 345kV
CountyCallahan
StateTX
Voltage345 kV
Capacity742.5 MW
Resource (as published)GAS/CC
Resource categoryGas (normalized for filtering)
Target commercial operation2031-07-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Reata Station substation: 2 requests in the ERCOT queue, 2 active totaling 2,227.5 MW.

Queue IDProjectMWResourceStatus
30INR0106Ironwood Energy Center1,485GasSS Started, FIS Started, No IA

Callahan, TX: 7 requests in the ERCOT queue, 7 active totaling 3,798.1 MW.

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-11-09 New request 742.5 Not reported → SS Started, FIS Started, No IA

Full change log →

Additional filed fields

Interconnecting entityIronwood Energy Center II
CDR reporting zoneWEST
Fuel codeGAS
Technology codeCC

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first