Wallflower Solar

ERCOT queue ID 30INR0092

Wallflower Solar (30INR0092) is listed in the ERCOT interconnection queue as a 201.2 MW solar project in Zapata County, TX. The filing names Tap the Cenizo (#) - Del Sol (#) line. as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 30, 2029. It records the screening study as complete on June 4, 2026.

Queue ID30INR0092
Project nameWallflower Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationTap the Cenizo (#) - Del Sol (#) line.
Point of interconnectionTap the 345 kV Cenizo (#80225) - Del Sol (#80307) line.
CountyZapata
StateTX
Voltage345 kV
Capacity201.2 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-12-30
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Zapata, TX: 28 requests in the ERCOT queue, 27 active totaling 6,291.1 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityWallflower Solar, LLC
CDR reporting zoneSOUTH
Fuel codeSOL
Technology codePV
Screening study complete2026-06-04
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first