La Morena Energy Center Solar
ERCOT queue ID 30INR0043
La Morena Energy Center Solar (30INR0043) is listed in the ERCOT interconnection queue as a 250 MW solar project in Zapata County, TX. The filing names Tap CENIZO7C - DELSOL7C as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of May 7, 2029. It records the screening study as complete on September 4, 2025.
| Queue ID | 30INR0043 |
|---|---|
| Project name | La Morena Energy Center Solar |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap CENIZO7C - DELSOL7C |
| Point of interconnection | Tap 345 kV (80225) CENIZO7C - (80307) DELSOL7C |
| County | Zapata |
| State | TX |
| Voltage | 345 kV |
| Capacity | 250 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-05-07 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Zapata, TX: 28 requests in the ERCOT queue, 27 active totaling 6,291.1 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Adapture Solar Development |
|---|---|
| CDR reporting zone | SOUTH |
| Fuel code | SOL |
| Technology code | PV |
| Screening study complete | 2025-09-04 |
| Water availability | Not Required |