Hecate Energy Arkansas Wind

ERCOT queue ID 30INR0004

Hecate Energy Arkansas Wind (30INR0004) is listed in the ERCOT interconnection queue as a 1,029.4 MW wind project in San Patricio County, TX. The filing names Naismith as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of June 1, 2030. It records the screening study as complete on September 22, 2023.

Queue ID30INR0004
Project nameHecate Energy Arkansas Wind
Status (as published)SS Completed, FIS Started, No IA
SubstationNaismith
Point of interconnection8659 Naismith 345kV
CountySan Patricio
StateTX
Voltage345 kV
Capacity1,029.4 MW
Resource (as published)WIN/WT
Resource categoryWind (normalized for filtering)
Target commercial operation2030-06-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

San Patricio, TX: 28 requests in the ERCOT queue, 27 active totaling 6,857.5 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityHecate Energy Gulf Wind LLC
CDR reporting zoneCOASTAL
Fuel codeWIN
Technology codeWT
Screening study complete2023-09-22
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.