Substation Scout

Southeast Oklahoma Pumped Storage

ERCOT queue ID 30INR0002

Southeast Oklahoma Pumped Storage (30INR0002) is listed in the ERCOT interconnection queue as a 1,232 MW hydro project in Lamar County, TX. The filing names Paris Switch as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of January 1, 2030. It records the screening study as complete on November 1, 2022.

Queue ID30INR0002
Project nameSoutheast Oklahoma Pumped Storage
Status (as published)SS Completed, FIS Started, No IA
SubstationParis Switch
Point of interconnection1692 Paris Switch 345kV
CountyLamar
StateTX
Voltage345 kV
Capacity1,232 MW
Resource (as published)WAT/OT
Resource categoryHydro (normalized for filtering)
Target commercial operation2030-01-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Lamar, TX: 28 requests in the ERCOT queue, 25 active totaling 6,189.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityApex Energy Solutions, LLC
CDR reporting zoneNORTH
Fuel codeWAT
Technology codeOT
Screening study complete2022-11-01

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first