Trail Boss Solar
ERCOT queue ID 29INR0412
Trail Boss Solar (29INR0412) is listed in the ERCOT interconnection queue as a 254 MW solar project in Comanche County, TX. The filing names Tap ODELL - 278 HASSE as its point of interconnection. ERCOT lists its status as “SS Started, FIS Started, No IA”, with a target commercial operation date of April 27, 2029.
| Queue ID | 29INR0412 |
|---|---|
| Project name | Trail Boss Solar |
| Status (as published) | SS Started, FIS Started, No IA |
| Substation | Tap ODELL - 278 HASSE |
| Point of interconnection | Tap 138 kV 33273 ODELL - 278 HASSE |
| County | Comanche |
| State | TX |
| Voltage | 138 kV |
| Capacity | 254 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-04-27 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Tap ODELL - 278 HASSE substation: 2 requests in the ERCOT queue, 2 active totaling 460.9 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 29INR0413 | Trail Boss BESS | 206.9 | Battery | SS Started, FIS Started, No IA |
Comanche, TX: 13 requests in the ERCOT queue, 10 active totaling 2,917.8 MW.
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-11-09 | New request | 254 | Not reported → SS Started, FIS Started, No IA |
Additional filed fields
| Interconnecting entity | Trail Boss Energy Center, LLC |
|---|---|
| CDR reporting zone | NORTH |
| Fuel code | SOL |
| Technology code | PV |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.