Rugged Prairie Wind
ERCOT queue ID 29INR0399
Rugged Prairie Wind (29INR0399) is listed in the ERCOT interconnection queue as a 294.1 MW wind project in Fisher County, TX. The filing names Tap BUS # Dermott- BUS # Kirchhef as its point of interconnection. ERCOT lists its status as “SS Started, FIS Started, No IA”, with a target commercial operation date of December 1, 2029.
| Queue ID | 29INR0399 |
|---|---|
| Project name | Rugged Prairie Wind |
| Status (as published) | SS Started, FIS Started, No IA |
| Substation | Tap BUS # Dermott- BUS # Kirchhef |
| Point of interconnection | Tap 345kV BUS #11305 Dermott- BUS #60706 Kirchhef |
| County | Fisher |
| State | TX |
| Voltage | 345 kV |
| Capacity | 294.1 MW |
| Resource (as published) | WIN/WT |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2029-12-01 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Fisher, TX: 13 requests in the ERCOT queue, 13 active totaling 6,376 MW.
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-10-05 | New request | 294.1 | Not reported → SS Started, FIS Started, No IA |
Additional filed fields
| Interconnecting entity | Rugged Prairie Wind, LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | WIN |
| Technology code | WT |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.