Ventures BESS
ERCOT queue ID 29INR0378
Ventures BESS (29INR0378) is listed in the ERCOT interconnection queue as a 238 MW battery project in Matagorda County, TX. The filing names BAY_CITY4A (Bus #) to BLKCAT4A (Bus #) as its point of interconnection. ERCOT lists its status as “SS Started, FIS Started, No IA”, with a target commercial operation date of July 15, 2029.
| Queue ID | 29INR0378 |
|---|---|
| Project name | Ventures BESS |
| Status (as published) | SS Started, FIS Started, No IA |
| Substation | BAY_CITY4A (Bus #) to BLKCAT4A (Bus #) |
| Point of interconnection | BAY_CITY4A 138 kV (Bus #8113) to BLKCAT4A 138 kV (Bus #80124) |
| County | Matagorda |
| State | TX |
| Voltage | 138 kV |
| Capacity | 238 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2029-07-15 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Matagorda, TX: 30 requests in the ERCOT queue, 23 active totaling 5,513.1 MW.
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-11-09 | New request | 238 | Not reported → SS Started, FIS Started, No IA |
Additional filed fields
| Interconnecting entity | Gransolar Texas Twelve, LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | OTH |
| Technology code | BA |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.