Enfinity Post Oak Storage SLF
ERCOT queue ID 29INR0292
Enfinity Post Oak Storage SLF (29INR0292) is listed in the ERCOT interconnection queue as a battery request filed at 0 MW (a net change or energy-only filing) in Borden County, TX. The filing names Muleshoe Transmission line as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 18, 2029. It records the screening study as complete on June 25, 2026.
| Queue ID | 29INR0292 |
|---|---|
| Project name | Enfinity Post Oak Storage SLF |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Muleshoe Transmission line |
| Point of interconnection | 345kV Muleshoe (59922) Transmission line |
| County | Borden |
| State | TX |
| Voltage | 345 kV |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2029-12-18 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Borden, TX: 19 requests in the ERCOT queue, 17 active totaling 5,556.7 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | EG White Oak LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2026-06-25 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.