Falcon BESS (29INR0169) is listed in the ERCOT interconnection queue as a 516.7 MW battery project in Zapata County, TX. The filing names Tap # CENIZO to # DEL SOL as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 1, 2029. It records the screening study as complete on October 28, 2025.

Queue ID29INR0169
Project nameFalcon BESS
Status (as published)SS Completed, FIS Started, No IA
SubstationTap # CENIZO to # DEL SOL
Point of interconnectionTap 345kV #80225 CENIZO to #80307 DEL SOL
CountyZapata
StateTX
Voltage345 kV
Capacity516.7 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-12-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Zapata, TX: 28 requests in the ERCOT queue, 27 active totaling 6,291.1 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityFalcon Energy Project, LLC
CDR reporting zoneSOUTH
Fuel codeOTH
Technology codeBA
Screening study complete2025-10-28

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.