Falcon BESS
ERCOT queue ID 29INR0169
Falcon BESS (29INR0169) is listed in the ERCOT interconnection queue as a 516.7 MW battery project in Zapata County, TX. The filing names Tap # CENIZO to # DEL SOL as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 1, 2029. It records the screening study as complete on October 28, 2025.
| Queue ID | 29INR0169 |
|---|---|
| Project name | Falcon BESS |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap # CENIZO to # DEL SOL |
| Point of interconnection | Tap 345kV #80225 CENIZO to #80307 DEL SOL |
| County | Zapata |
| State | TX |
| Voltage | 345 kV |
| Capacity | 516.7 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2029-12-01 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Zapata, TX: 28 requests in the ERCOT queue, 27 active totaling 6,291.1 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Falcon Energy Project, LLC |
|---|---|
| CDR reporting zone | SOUTH |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2025-10-28 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.