NRG Prairie Energy Center

ERCOT queue ID 29INR0158

NRG Prairie Energy Center (29INR0158) is listed in the ERCOT interconnection queue as a 1,253 MW gas project in Hill County, TX. The filing names Tap # Venus Switch – # Fort Smith Switch as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 31, 2030. It records the screening study as complete on June 30, 2026.

Queue ID29INR0158
Project nameNRG Prairie Energy Center
Status (as published)SS Completed, FIS Started, No IA
SubstationTap # Venus Switch – # Fort Smith Switch
Point of interconnectionTap #1907 Venus Switch – #3389 Fort Smith Switch 345 kV
CountyHill
StateTX
Voltage345 kV
Capacity1,253 MW
Resource (as published)GAS/CC
Resource categoryGas (normalized for filtering)
Target commercial operation2030-12-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Hill, TX: 27 requests in the ERCOT queue, 23 active totaling 7,894.6 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityNRG Prairie Energy Center LLC
CDR reporting zoneNORTH
Fuel codeGAS
Technology codeCC
Screening study complete2026-06-30

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.