Substation Scout

MilamStation Power Secured Gas Generation

ERCOT queue ID 29INR0120

MilamStation Power Secured Gas Generation (29INR0120) is listed in the ERCOT interconnection queue as a 846 MW gas project in Milam County, TX. The filing names Little Pond Switch (Bus #) – Hog Creek Switch (Bus #) Line as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 25, 2029. It records the screening study as complete on June 19, 2025.

Queue ID29INR0120
Project nameMilamStation Power Secured Gas Generation
Status (as published)SS Completed, FIS Started, No IA
SubstationLittle Pond Switch (Bus #) – Hog Creek Switch (Bus #) Line
Point of interconnectionLittle Pond Switch (Bus #3377) – Hog Creek Switch (Bus #3704) 345 kV Line
CountyMilam
StateTX
Voltage345 kV
Capacity846 MW
Resource (as published)GAS/CC
Resource categoryGas (normalized for filtering)
Target commercial operation2029-09-25
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Milam, TX: 35 requests in the ERCOT queue, 30 active totaling 8,525.6 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityLCC-TX8, LLC
CDR reporting zoneSOUTH
Fuel codeGAS
Technology codeCC
Screening study complete2025-06-19

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first