Simsboro Storage

ERCOT queue ID 29INR0119

Simsboro Storage (29INR0119) is listed in the ERCOT interconnection queue as a 301.6 MW battery project in Freestone County, TX. The filing names Tap Outlaw – Limestone as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of March 31, 2029. It records the screening study as complete on September 4, 2025.

Queue ID29INR0119
Project nameSimsboro Storage
Status (as published)SS Completed, FIS Started, No IA
SubstationTap Outlaw – Limestone
Point of interconnectionTap Outlaw (3386) – Limestone (46020)
CountyFreestone
StateTX
VoltageNot reported
Capacity301.6 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-03-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Freestone, TX: 24 requests in the ERCOT queue, 24 active totaling 7,337.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entitySimsboro Storage LLC
CDR reporting zoneNORTH
Fuel codeOTH
Technology codeBA
Screening study complete2025-09-04

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.