Gregory Power Development SLF

ERCOT queue ID 29INR0068

Gregory Power Development SLF (29INR0068) is listed in the ERCOT interconnection queue as a 469.9 MW gas project in San Patricio County, TX. The filing names Resnick as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of December 19, 2028. It records the screening study as complete on February 20, 2025 and the interconnection agreement as signed on July 1, 2026.

Queue ID29INR0068
Project nameGregory Power Development SLF
Status (as published)SS Completed, FIS Started, IA
SubstationResnick
Point of interconnection8580 Resnick 138kV
CountySan Patricio
StateTX
Voltage138 kV
Capacity469.9 MW
Resource (as published)GAS/CC
Resource categoryGas (normalized for filtering)
Target commercial operation2028-12-19
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

San Patricio, TX: 28 requests in the ERCOT queue, 27 active totaling 6,857.5 MW.

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-05 Status change n/a SS Completed, FIS Started, No IA → SS Completed, FIS Started, IA

Full change log →

Additional filed fields

Interconnecting entityGregory Power Partners LLC
CDR reporting zoneCOASTAL
Fuel codeGAS
Technology codeCC
Interconnection agreement signed2026-07-01
Screening study complete2025-02-20
Air permit2025-12-15
Water availability2026-07-15

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.