Crape Myrtle Solar

ERCOT queue ID 28INR0531

Crape Myrtle Solar (28INR0531) is listed in the ERCOT interconnection queue as a 140.7 MW solar project in Ellis County, TX. The filing names Tap OLDCNTRY_5 - NOTUS_5 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of April 15, 2030. It records the screening study as complete on October 1, 2026.

Queue ID28INR0531
Project nameCrape Myrtle Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationTap OLDCNTRY_5 - NOTUS_5
Point of interconnectionTap 345 kV 2255 OLDCNTRY_5 - 3376 NOTUS_5
CountyEllis
StateTX
Voltage345 kV
Capacity140.7 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2030-04-15
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Ellis, TX: 30 requests in the ERCOT queue, 26 active totaling 5,761.2 MW.

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-11-09 Status change n/a SS Started, FIS Started, No IA → SS Completed, FIS Started, No IA

Full change log →

Additional filed fields

Interconnecting entityCrape Myrtle Solar LLC
CDR reporting zoneNORTH
Fuel codeSOL
Technology codePV
Screening study complete2026-10-01
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.