Substation Scout

Rancho Grande Solar

ERCOT queue ID 28INR0503

Rancho Grande Solar (28INR0503) is listed in the ERCOT interconnection queue as a 251.6 MW solar project in Zapata County, TX. The filing names Tiempo Substation # as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of May 9, 2028. It records the screening study as complete on June 30, 2026.

Queue ID28INR0503
Project nameRancho Grande Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationTiempo Substation #
Point of interconnection345 kV Tiempo Substation #80224
CountyZapata
StateTX
Voltage345 kV
Capacity251.6 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-05-09
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Zapata, TX: 28 requests in the ERCOT queue, 27 active totaling 6,291.1 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityBordas Renewable Energy, LLC
CDR reporting zoneSOUTH
Fuel codeSOL
Technology codePV
Screening study complete2026-06-30
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.