Spectra Solar
ERCOT queue ID 28INR0486
Spectra Solar (28INR0486) is listed in the ERCOT interconnection queue as a 1,200 MW solar project in Scurry County, TX. The filing names Galvani as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of November 16, 2028. It records the screening study as complete on March 23, 2026 and the interconnection agreement as signed on December 29, 2025.
| Queue ID | 28INR0486 |
|---|---|
| Project name | Spectra Solar |
| Status (as published) | SS Completed, FIS Started, IA |
| Substation | Galvani |
| Point of interconnection | 59912 Galvani 345KV |
| County | Scurry |
| State | TX |
| Voltage | 345 kV |
| Capacity | 1,200 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-11-16 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Scurry, TX: 23 requests in the ERCOT queue, 17 active totaling 5,057.9 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | SE DC Devco |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | SOL |
| Technology code | PV |
| Interconnection agreement signed | 2025-12-29 |
| Screening study complete | 2026-03-23 |
| Water availability | Not Required |