Vista Bluff Wind I "Alternate POI" (28INR0446) is listed in the ERCOT interconnection queue as a 290.4 MW wind project in Upton County, TX. The filing names tap North McCamey - Bearkat (Benedum station that LCRA will build part of 24RPG024). as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 31, 2029. It records the screening study as complete on December 12, 2025.
| Queue ID | 28INR0446 |
|---|---|
| Project name | Vista Bluff Wind I "Alternate POI" |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | tap North McCamey - Bearkat (Benedum station that LCRA will build part of 24RPG024). |
| Point of interconnection | tap 345 kV (76000) North McCamey - (59903) Bearkat (Benedum 345 kV station that LCRA will build part of 24RPG024). |
| County | Upton |
| State | TX |
| Voltage | 345 kV |
| Capacity | 290.4 MW |
| Resource (as published) | WIN/WT |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2029-12-31 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Upton, TX: 22 requests in the ERCOT queue, 18 active totaling 5,611.9 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Vista Bluff Windpower, LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | WIN |
| Technology code | WT |
| Screening study complete | 2025-12-12 |
| Water availability | Not Required |