Penelope Solar (28INR0404) is listed in the ERCOT interconnection queue as a 97.8 MW solar project in Hill County, TX. The filing names New sub in the 234 Chatt - Ash Creek line as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 24, 2029. It records the screening study as complete on October 2, 2025.

Queue ID28INR0404
Project namePenelope Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationNew sub in the 234 Chatt - Ash Creek line
Point of interconnectionNew sub in the 234 Chatt - 3473 Ash Creek 138kV line
CountyHill
StateTX
Voltage138 kV
Capacity97.8 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-09-24
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Hill, TX: 27 requests in the ERCOT queue, 23 active totaling 7,894.6 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityAsh Creek Project LLC
CDR reporting zoneNORTH
Fuel codeSOL
Technology codePV
Screening study complete2025-10-02
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first