Penelope Solar
ERCOT queue ID 28INR0404
Penelope Solar (28INR0404) is listed in the ERCOT interconnection queue as a 97.8 MW solar project in Hill County, TX. The filing names New sub in the 234 Chatt - Ash Creek line as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 24, 2029. It records the screening study as complete on October 2, 2025.
| Queue ID | 28INR0404 |
|---|---|
| Project name | Penelope Solar |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | New sub in the 234 Chatt - Ash Creek line |
| Point of interconnection | New sub in the 234 Chatt - 3473 Ash Creek 138kV line |
| County | Hill |
| State | TX |
| Voltage | 138 kV |
| Capacity | 97.8 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-09-24 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Hill, TX: 27 requests in the ERCOT queue, 23 active totaling 7,894.6 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Ash Creek Project LLC |
|---|---|
| CDR reporting zone | NORTH |
| Fuel code | SOL |
| Technology code | PV |
| Screening study complete | 2025-10-02 |
| Air permit | Not Required |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.