Galaxy Storage 2

ERCOT queue ID 28INR0387

Galaxy Storage 2 (28INR0387) is listed in the ERCOT interconnection queue as a 201.9 MW battery project in Ellis County, TX. The filing names 3/4-Breaker Ring Bus at Venus Switch (#) BKR - Navarro Switch (LST) (#) BKR 3B3134/3B3127 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of October 30, 2029. It records the screening study as complete on September 17, 2025.

Queue ID28INR0387
Project nameGalaxy Storage 2
Status (as published)SS Completed, FIS Started, No IA
Substation3/4-Breaker Ring Bus at Venus Switch (#) BKR - Navarro Switch (LST) (#) BKR 3B3134/3B3127
Point of interconnection3/4-Breaker Ring Bus at 345kV Venus Switch (#1907) BKR 4920 - Navarro Switch (LST) (#68091) BKR 3B3134/3B3127
CountyEllis
StateTX
Voltage345 kV
Capacity201.9 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-10-30
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Ellis, TX: 30 requests in the ERCOT queue, 26 active totaling 5,761.2 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityGalaxy Solar 2, LLC
CDR reporting zoneNORTH
Fuel codeOTH
Technology codeBA
Screening study complete2025-09-17

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.