Galaxy Solar 2
ERCOT queue ID 28INR0385
Galaxy Solar 2 (28INR0385) is listed in the ERCOT interconnection queue as a 301.6 MW solar project in Ellis County, TX. The filing names 3/4-Breaker Ring Bus at Venus Switch (#) BKR - Navarro Switch (LST) (#) BKR 3B3134/3B3127 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of October 30, 2029. It records the screening study as complete on September 17, 2025.
| Queue ID | 28INR0385 |
|---|---|
| Project name | Galaxy Solar 2 |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | 3/4-Breaker Ring Bus at Venus Switch (#) BKR - Navarro Switch (LST) (#) BKR 3B3134/3B3127 |
| Point of interconnection | 3/4-Breaker Ring Bus at 345kV Venus Switch (#1907) BKR 4920 - Navarro Switch (LST) (#68091) BKR 3B3134/3B3127 |
| County | Ellis |
| State | TX |
| Voltage | 345 kV |
| Capacity | 301.6 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-10-30 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Ellis, TX: 30 requests in the ERCOT queue, 26 active totaling 5,761.2 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Galaxy Solar 2, LLC |
|---|---|
| CDR reporting zone | NORTH |
| Fuel code | SOL |
| Technology code | PV |
| Screening study complete | 2025-09-17 |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.