Bastion BESS

ERCOT queue ID 28INR0341

Bastion BESS (28INR0341) is listed in the ERCOT interconnection queue as a 154.3 MW battery project in Matagorda County, TX. The filing names Blessing Substation (ID ) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of November 1, 2028. It records the screening study as complete on October 1, 2025.

Queue ID28INR0341
Project nameBastion BESS
Status (as published)SS Completed, FIS Started, No IA
SubstationBlessing Substation (ID )
Point of interconnectionBlessing Substation 138 kV (ID 8121)
CountyMatagorda
StateTX
Voltage138 kV
Capacity154.3 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-11-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Matagorda, TX: 30 requests in the ERCOT queue, 23 active totaling 5,513.1 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityBESS BASTION LLC
CDR reporting zoneCOASTAL
Fuel codeOTH
Technology codeBA
Screening study complete2025-10-01

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first