Oak Valley Solar

ERCOT queue ID 28INR0335

Oak Valley Solar (28INR0335) is listed in the ERCOT interconnection queue as a 251.3 MW solar project in Navarro County, TX. The filing names (Navarro) (345) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 28, 2029. It records the screening study as complete on June 25, 2025.

Queue ID28INR0335
Project nameOak Valley Solar
Status (as published)SS Completed, FIS Started, No IA
Substation(Navarro) (345)
Point of interconnection68091 (Navarro) (345)
CountyNavarro
StateTX
VoltageNot reported
Capacity251.3 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-09-28
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Navarro, TX: 29 requests in the ERCOT queue, 26 active totaling 4,412.7 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityOak Valley Solar LLC
CDR reporting zoneNORTH
Fuel codeSOL
Technology codePV
Screening study complete2025-06-25
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.