Falcon Solar
ERCOT queue ID 28INR0317
Falcon Solar (28INR0317) is listed in the ERCOT interconnection queue as a 502 MW solar project in Zapata County, TX. The filing names Tap # Cenizo7C to # Del Sol7C as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 1, 2029. It records the screening study as complete on January 12, 2026.
| Queue ID | 28INR0317 |
|---|---|
| Project name | Falcon Solar |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap # Cenizo7C to # Del Sol7C |
| Point of interconnection | Tap 345kV #80225 Cenizo7C to #80307 Del Sol7C |
| County | Zapata |
| State | TX |
| Voltage | 345 kV |
| Capacity | 502 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-12-01 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Zapata, TX: 28 requests in the ERCOT queue, 27 active totaling 6,291.1 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Falcon Energy Project, LLC |
|---|---|
| CDR reporting zone | SOUTH |
| Fuel code | SOL |
| Technology code | PV |
| Screening study complete | 2026-01-12 |
| Air permit | Not Required |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.