Prairie Power Wind

ERCOT queue ID 28INR0307

Prairie Power Wind (28INR0307) is listed in the ERCOT interconnection queue as a 302.9 MW wind project in Mitchell County, TX. The filing names Tap Longshore Switch (Bus# ) to Cattleman Switch (Bus# ) CKT 4 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of April 17, 2029. It records the screening study as complete on September 2, 2025.

Queue ID28INR0307
Project namePrairie Power Wind
Status (as published)SS Completed, FIS Started, No IA
SubstationTap Longshore Switch (Bus# ) to Cattleman Switch (Bus# ) CKT 4
Point of interconnectionTap 345 kV Longshore Switch (Bus# 1058) to Cattleman Switch (Bus# 10053) CKT 4
CountyMitchell
StateTX
Voltage345 kV
Capacity302.9 MW
Resource (as published)WIN/WT
Resource categoryWind (normalized for filtering)
Target commercial operation2029-04-17
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Mitchell, TX: 19 requests in the ERCOT queue, 17 active totaling 7,498.1 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityPrairie Power Wind, LLC
CDR reporting zoneWEST
Fuel codeWIN
Technology codeWT
Screening study complete2025-09-02
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.