Magnet Solar (28INR0297) is listed in the ERCOT interconnection queue as a 503.1 MW solar project in Borden County, TX. The filing names Faraday Substation - Bus # as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of September 29, 2029. It records the screening study as complete on July 19, 2025 and the interconnection agreement as signed on December 11, 2025.

Queue ID28INR0297
Project nameMagnet Solar
Status (as published)SS Completed, FIS Started, IA
SubstationFaraday Substation - Bus #
Point of interconnectionFaraday Substation 345kV - Bus #59905
CountyBorden
StateTX
Voltage345 kV
Capacity503.1 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-09-29
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Borden, TX: 19 requests in the ERCOT queue, 17 active totaling 5,556.7 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityHyFuels Big Spring Solar LLC
CDR reporting zoneWEST
Fuel codeSOL
Technology codePV
Interconnection agreement signed2025-12-11
Screening study complete2025-07-19
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first