ERCOT queue ID 28INR0278

Spur Energy Storage (28INR0278) is listed in the ERCOT interconnection queue as a 612.6 MW battery project in Wise County, TX. The filing names Tap JACKSBRO_5 - BIRDDOG_5 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 15, 2029. It records the screening study as complete on May 20, 2025.

Queue ID28INR0278
Project nameSpur Energy Storage
Status (as published)SS Completed, FIS Started, No IA
SubstationTap JACKSBRO_5 - BIRDDOG_5
Point of interconnectionTap 345kV (1429) JACKSBRO_5 - (11736) BIRDDOG_5
CountyWise
StateTX
Voltage345 kV
Capacity612.6 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-09-15
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Wise, TX: 11 requests in the ERCOT queue, 10 active totaling 3,798 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entitySpur Energy Storage, LLC
CDR reporting zoneNORTH
Fuel codeOTH
Technology codeBA
Screening study complete2025-05-20

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.