Mojo Solar

ERCOT queue ID 28INR0250

Mojo Solar (28INR0250) is listed in the ERCOT interconnection queue as a 527.9 MW solar project in Wilson County, TX. The filing names Tap Elm Creek - San Miguel CKT 1 & 2 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of June 30, 2028. It records the screening study as complete on May 19, 2025.

Queue ID28INR0250
Project nameMojo Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationTap Elm Creek - San Miguel CKT 1 & 2
Point of interconnectionTap 345 kV 5133 Elm Creek - 5901 San Miguel CKT 1 & 2
CountyWilson
StateTX
Voltage345 kV
Capacity527.9 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-06-30
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Wilson, TX: 18 requests in the ERCOT queue, 15 active totaling 3,532.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityPower Synergy
CDR reporting zoneSOUTH
Fuel codeSOL
Technology codePV
Screening study complete2025-05-19
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first