Ponferrada Solar

ERCOT queue ID 28INR0182

Ponferrada Solar (28INR0182) is listed in the ERCOT interconnection queue as a 148.9 MW solar project in Navarro County, TX. The filing names Tap CORSWEST1_8 - CORS_MOBT_8 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of April 6, 2029. It records the screening study as complete on December 18, 2024.

Queue ID28INR0182
Project namePonferrada Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationTap CORSWEST1_8 - CORS_MOBT_8
Point of interconnectionTap 138 KV 3456 CORSWEST1_8 - 3457 CORS_MOBT_8
CountyNavarro
StateTX
Voltage138 kV
Capacity148.9 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-04-06
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Navarro, TX: 29 requests in the ERCOT queue, 26 active totaling 4,412.7 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityKarol Solar VI
CDR reporting zoneNORTH
Fuel codeSOL
Technology codePV
Screening study complete2024-12-18
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.