Substation Scout

River Boat Storage

ERCOT queue ID 28INR0133

River Boat Storage (28INR0133) is listed in the ERCOT interconnection queue as a 207 MW battery project in Mitchell County, TX. The filing names Tap Cattlemen 5 - Gasconades Creek as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, No IA”, with a target commercial operation date of April 21, 2029. It records the screening study as complete on December 2, 2024 and the full interconnection study as approved on June 29, 2026.

Queue ID28INR0133
Project nameRiver Boat Storage
Status (as published)SS Completed, FIS Completed, No IA
SubstationTap Cattlemen 5 - Gasconades Creek
Point of interconnectionTap 345kV 10053 Cattlemen 5 - 76030 Gasconades Creek
CountyMitchell
StateTX
Voltage345 kV
Capacity207 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-04-21
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Tap Cattlemen 5 - Gasconades Creek substation: 2 requests in the ERCOT queue, 2 active totaling 709.2 MW.

Queue IDProjectMWResourceStatus
28INR0132River Boat Solar502.2SolarSS Completed, FIS Completed, No IA

Mitchell, TX: 19 requests in the ERCOT queue, 17 active totaling 7,498.1 MW.

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-11-09 Status change n/a Inactive → SS Completed, FIS Completed, No IA

Full change log →

Additional filed fields

Interconnecting entityChampion Creek Storage, LLC
CDR reporting zoneWEST
Fuel codeOTH
Technology codeBA
Screening study complete2024-12-02
Full interconnection study approved2026-06-29

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.