Rabbit Hollow Energy Storage

ERCOT queue ID 28INR0119

Rabbit Hollow Energy Storage (28INR0119) is listed in the ERCOT interconnection queue as a 339.3 MW battery project in Mitchell County, TX. The filing names Barber Lake Switch as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 31, 2029. It records the screening study as complete on March 18, 2025.

Queue ID28INR0119
Project nameRabbit Hollow Energy Storage
Status (as published)SS Completed, FIS Started, No IA
SubstationBarber Lake Switch
Point of interconnection1190 Barber Lake Switch 138kV
CountyMitchell
StateTX
Voltage138 kV
Capacity339.3 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-12-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Mitchell, TX: 19 requests in the ERCOT queue, 17 active totaling 7,498.1 MW.

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-11-09 Capacity revised −2.5 SS Completed, FIS Started, No IA → SS Completed, FIS Started, No IA

Full change log →

Additional filed fields

Interconnecting entityRabbit Hollow Energy Storage, LLC
CDR reporting zoneWEST
Fuel codeOTH
Technology codeBA
Screening study complete2025-03-18

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.