Pham BESS

ERCOT queue ID 28INR0094

Pham BESS (28INR0094) is listed in the ERCOT interconnection queue as a 133 MW battery project in Anderson County, TX. The filing names Tap TENNCLNY_8 - BLACKFTAP_8 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Not Started, IA”, with a target commercial operation date of September 18, 2028. It records the screening study as complete on September 10, 2024 and the interconnection agreement as signed on July 31, 2026.

Queue ID28INR0094
Project namePham BESS
Status (as published)SS Completed, FIS Not Started, IA
SubstationTap TENNCLNY_8 - BLACKFTAP_8
Point of interconnectionTap 138kV 3281 TENNCLNY_8 - 3499 BLACKFTAP_8
CountyAnderson
StateTX
Voltage138 kV
Capacity133 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-09-18
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Anderson, TX: 9 requests in the ERCOT queue, 9 active totaling 4,644.7 MW.

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-09-07 Status change n/a SS Completed, FIS Started, No IA → SS Completed, FIS Not Started, IA

Full change log →

Additional filed fields

Interconnecting entityASB1, LLC
CDR reporting zoneNORTH
Fuel codeOTH
Technology codeBA
Interconnection agreement signed2026-07-31
Screening study complete2024-09-10
Air permitNot Required
Water availability2026-08-11

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.