Alpujarra Solar

ERCOT queue ID 28INR0068

Alpujarra Solar (28INR0068) is listed in the ERCOT interconnection queue as a 112.5 MW solar project in Wharton County, TX. The filing names GALOW as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of May 1, 2028. It records the screening study as complete on November 27, 2024.

Queue ID28INR0068
Project nameAlpujarra Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationGALOW
Point of interconnection5521 GALOW 138 KV
CountyWharton
StateTX
Voltage138 kV
Capacity112.5 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-05-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Wharton, TX: 44 requests in the ERCOT queue, 42 active totaling 8,624.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityGreening USA Corp.
CDR reporting zoneSOUTH
Fuel codeSOL
Technology codePV
Screening study complete2024-11-27
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.