Indigo Solar 3

ERCOT queue ID 28INR0067

Indigo Solar 3 (28INR0067) is listed in the ERCOT interconnection queue as a 800 MW solar project in Fisher County, TX. The filing names Tap Line Segment Tankawa (Bus #) to Graham (Bus #) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of November 1, 2028. It records the screening study as complete on January 25, 2025.

Queue ID28INR0067
Project nameIndigo Solar 3
Status (as published)SS Completed, FIS Started, No IA
SubstationTap Line Segment Tankawa (Bus #) to Graham (Bus #)
Point of interconnectionTap Line Segment Tankawa (Bus #1048) to Graham (Bus #1430)
CountyFisher
StateTX
VoltageNot reported
Capacity800 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-11-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Fisher, TX: 13 requests in the ERCOT queue, 13 active totaling 6,376 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityIndigo solar 3
CDR reporting zoneWEST
Fuel codeSOL
Technology codePV
Screening study complete2025-01-25
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.