Three Canes Gas P2
ERCOT queue ID 27INR0652
Three Canes Gas P2 (27INR0652) is listed in the ERCOT interconnection queue as a gas request filed at 0 MW (a net change or energy-only filing) in Freestone County, TX. The filing names Tap on the Outlaw Switch (bus #) to Limestone Plant Station (bus #) Transmission Line as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of November 30, 2027. It records the screening study as complete on October 1, 2026.
| Queue ID | 27INR0652 |
|---|---|
| Project name | Three Canes Gas P2 |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap on the Outlaw Switch (bus #) to Limestone Plant Station (bus #) Transmission Line |
| Point of interconnection | Tap on the 345 kV Outlaw Switch (bus #3386) to Limestone Plant Station (bus #46020) Transmission Line |
| County | Freestone |
| State | TX |
| Voltage | 345 kV |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | GAS/IC |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2027-11-30 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Freestone, TX: 24 requests in the ERCOT queue, 24 active totaling 7,337.8 MW.
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-11-09 | Status change | n/a | SS Started, FIS Started, No IA → SS Completed, FIS Started, No IA |
Additional filed fields
| Interconnecting entity | CleanAI, LLC |
|---|---|
| CDR reporting zone | NORTH |
| Fuel code | GAS |
| Technology code | IC |
| Screening study complete | 2026-10-01 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.