Files BESS SLF
ERCOT queue ID 27INR0646
Files BESS SLF (27INR0646) is listed in the ERCOT interconnection queue as a 34 MW battery project in Hill County, TX. The filing names Fort Smith Switch (#) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of November 7, 2029. It records the screening study as complete on October 14, 2026.
| Queue ID | 27INR0646 |
|---|---|
| Project name | Files BESS SLF |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Fort Smith Switch (#) |
| Point of interconnection | Fort Smith Switch (#3389) 345 kV |
| County | Hill |
| State | TX |
| Voltage | 345 kV |
| Capacity | 34 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2029-11-07 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Hill, TX: 27 requests in the ERCOT queue, 23 active totaling 7,894.6 MW.
Tracked changes
2 changes observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-11-09 | Status change | n/a | SS Started, FIS Started, No IA → SS Completed, FIS Started, No IA |
| 2026-09-07 | Capacity revised | −116.1 | SS Started, FIS Started, No IA → SS Started, FIS Started, No IA |
Additional filed fields
| Interconnecting entity | Files BESS |
|---|---|
| CDR reporting zone | NORTH |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2026-10-14 |
| Air permit | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.