Prairie Point Energy Storage I
ERCOT queue ID 27INR0618
Prairie Point Energy Storage I (27INR0618) is listed in the ERCOT interconnection queue as a 1,000 MW battery project in Wise County, TX. The filing names RAMHORNH 5 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 31, 2027. It records the screening study as complete on August 7, 2026.
| Queue ID | 27INR0618 |
|---|---|
| Project name | Prairie Point Energy Storage I |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | RAMHORNH 5 |
| Point of interconnection | RAMHORNH 5 - 31875 |
| County | Wise |
| State | TX |
| Voltage | Not reported |
| Capacity | 1,000 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2027-12-31 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
RAMHORNH 5 substation: 2 requests in the ERCOT queue, 2 active totaling 2,000 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 27INR0619 | Prairie Point Energy Storage II | 1,000 | Battery | SS Completed, FIS Started, No IA |
Wise, TX: 11 requests in the ERCOT queue, 10 active totaling 3,798 MW.
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-09-07 | Status change | n/a | SS Started, FIS Started, No IA → SS Completed, FIS Started, No IA |
Additional filed fields
| Interconnecting entity | Prairie Point LLC |
|---|---|
| CDR reporting zone | NORTH |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2026-08-07 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.