Portland Storage SLF

ERCOT queue ID 27INR0524

Portland Storage SLF (27INR0524) is listed in the ERCOT interconnection queue as a battery request filed at 0 MW (a net change or energy-only filing) in San Patricio County, TX. The filing names HOT IRON 4A HOT IRON 4B (2) POIs will be used for this project because there are (2) lines supplying the ArcelorMittal plant. Project physical connection will be bus at ArcelorMittal. as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of January 3, 2028. It records the screening study as complete on October 6, 2025.

Queue ID27INR0524
Project namePortland Storage SLF
Status (as published)SS Completed, FIS Started, No IA
SubstationHOT IRON 4A HOT IRON 4B (2) POIs will be used for this project because there are (2) lines supplying the ArcelorMittal plant. Project physical connection will be bus at ArcelorMittal.
Point of interconnection8566 HOT IRON 4A 138 kV 8569 HOT IRON 4B 138 kV (2) POIs will be used for this project because there are (2) 138 kV lines supplying the ArcelorMittal plant. Project physical connection will be 13.8 kV bus at ArcelorMittal.
CountySan Patricio
StateTX
Voltage138 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-01-03
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

San Patricio, TX: 28 requests in the ERCOT queue, 27 active totaling 6,857.5 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityConvergent Energy Solutions LLC
CDR reporting zoneCOASTAL
Fuel codeOTH
Technology codeBA
Screening study complete2025-10-06

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first