Draco Solar
ERCOT queue ID 27INR0499
| Queue ID | 27INR0499 |
|---|---|
| Project name | Draco Solar |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap Long Draw () – Faraday () CKT 1 and LONGDRAW () - GALVANI() CKT 2 |
| Point of interconnection | Tap Long Draw (59900) – Faraday (59905) CKT 1 and LONGDRAW (59900) - GALVANI(59912) CKT 2 |
| County | Borden |
| State | TX |
| Voltage | Not reported |
| Capacity | 500 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2027-08-19 |
| Source dataset | large |
Additional filed fields
| Interconnecting Entity | Draco Solar LLC |
|---|---|
| Cdr Zone | WEST |
| Fuel Code | SOL |
| Technology Code | PV |
| Screening Study Complete | 45857 |
| Water Availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.