Substation Scout

Obbligato BESS

ERCOT queue ID 27INR0494

Obbligato BESS (27INR0494) is listed in the ERCOT interconnection queue as a 200.7 MW battery project in Milam County, TX. The filing names Tap 120# TALBRTRIDG – # MINERVA1_8 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of February 28, 2030. It records the screening study as complete on September 10, 2025.

Queue ID27INR0494
Project nameObbligato BESS
Status (as published)SS Completed, FIS Started, No IA
SubstationTap 120# TALBRTRIDG – # MINERVA1_8
Point of interconnectionTap 138kV 120# TALBRTRIDG – 3683# MINERVA1_8
CountyMilam
StateTX
Voltage138 kV
Capacity200.7 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2030-02-28
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Milam, TX: 35 requests in the ERCOT queue, 30 active totaling 8,525.6 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityObbligato BESS, LLC
CDR reporting zoneSOUTH
Fuel codeOTH
Technology codeBA
Screening study complete2025-09-10

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first