Substation Scout

Borden Dino Solar

ERCOT queue ID 27INR0480

Borden Dino Solar (27INR0480) is listed in the ERCOT interconnection queue as a 120.5 MW solar project in Borden County, TX. The filing names FARADAY as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of July 1, 2028. It records the screening study as complete on June 9, 2025.

Queue ID27INR0480
Project nameBorden Dino Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationFARADAY
Point of interconnection59905 FARADAY 345KV
CountyBorden
StateTX
Voltage345 kV
Capacity120.5 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-07-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

FARADAY substation: 2 requests in the ERCOT queue, 2 active totaling 180.8 MW.

Queue IDProjectMWResourceStatus
27INR0481Borden Dino BESS60.3BatterySS Completed, FIS Started, No IA

Borden, TX: 19 requests in the ERCOT queue, 17 active totaling 5,556.7 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityBorden Dino Solar, LLC
CDR reporting zoneWEST
Fuel codeSOL
Technology codePV
Screening study complete2025-06-09
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first