Borden Dino Solar
ERCOT queue ID 27INR0480
Borden Dino Solar (27INR0480) is listed in the ERCOT interconnection queue as a 120.5 MW solar project in Borden County, TX. The filing names FARADAY as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of July 1, 2028. It records the screening study as complete on June 9, 2025.
| Queue ID | 27INR0480 |
|---|---|
| Project name | Borden Dino Solar |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | FARADAY |
| Point of interconnection | 59905 FARADAY 345KV |
| County | Borden |
| State | TX |
| Voltage | 345 kV |
| Capacity | 120.5 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-07-01 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
FARADAY substation: 2 requests in the ERCOT queue, 2 active totaling 180.8 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 27INR0481 | Borden Dino BESS | 60.3 | Battery | SS Completed, FIS Started, No IA |
Borden, TX: 19 requests in the ERCOT queue, 17 active totaling 5,556.7 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Borden Dino Solar, LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | SOL |
| Technology code | PV |
| Screening study complete | 2025-06-09 |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.