Kickstart Energy Storage II

ERCOT queue ID 27INR0470

Kickstart Energy Storage II (27INR0470) is listed in the ERCOT interconnection queue as a 1.4 MW battery project in Ellis County, TX. The filing names Tap Venus Switch - BYNUM_5 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 30, 2029. It records the screening study as complete on June 9, 2025.

Queue ID27INR0470
Project nameKickstart Energy Storage II
Status (as published)SS Completed, FIS Started, No IA
SubstationTap Venus Switch - BYNUM_5
Point of interconnectionTap 345 kV 1907 Venus Switch - 3383 BYNUM_5
CountyEllis
StateTX
Voltage345 kV
Capacity1.4 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-09-30
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Tap Venus Switch - BYNUM_5 substation: 2 requests in the ERCOT queue, 2 active totaling 2.8 MW.

Queue IDProjectMWResourceStatus
27INR0469Kickstart Energy Storage I1.4BatterySS Completed, FIS Started, No IA

Ellis, TX: 30 requests in the ERCOT queue, 26 active totaling 5,761.2 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityKickstart Infrastructure LLC
CDR reporting zoneNORTH
Fuel codeOTH
Technology codeBA
Screening study complete2025-06-09

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.